Electrical Engineer, Data Center Construction and Design
- linkCopy link
- emailEmail a friend
In-office locations: Stockholm, Sweden.
Remote location(s): Sweden.
Minimum qualifications:
- Bachelor's degree in Electrical, Mechanical, Industrial, or Construction Engineering or equivalent practical experience.
- 3 years of experience in design development of electrical power distribution and data center infrastructure products.
- 3 years of experience with Electrical Engineering for construction projects in a data center colocation facility.
Preferred qualifications:
- Experience managing vendor relationships, with an understanding of standard practices in the design and construction industry.
- Experience working with data center equipment/environments (including switchgear, generators, controls, security monitoring systems, fire safety systems), with an understanding of start up/commissioning processes.
- Experience managing construction projects within an international working environment.
- Ability to travel 15% of the time as needed.
About the job
Our thirst for technology is a part of everything we do. The Data Center Engineering team takes the physical design of our data centers into the future. Our lab mirrors a research and development department -- cutting-edge strategies are born, tested and tested again. Along with a team of great minds, you take on complex topics like how we use power or how to run state-of-the-art, environmentally-friendly facilities. You're a visionary who optimizes for efficiencies and never stops seeking improvements -- even small changes that can make a huge impact. You generate ideas, communicate recommendations to senior-level executives and drive implementation alongside facilities technicians.Electrical Engineering support supporting the delivery of the projects in line with the schedule, cost, quality and safety requirements.
Responsibilities
- Act as the lead electrical subject matter expert, providing technical leadership to resolve critical field issues and troubleshooting advanced system events.
- Support program managers and coordinate with contractors, vendors, and authorities to ensure projects are delivered safely, on schedule, and within budget.
- Provide technical leadership to the projects, support and optimise project design, scope, schedule, quality, commissioning and safety for electrical discipline. Provide feedback to the central partner teams on possible improvements.
- Drive project electrical outcomes of high complexity and scope as a key contributor, integrating feedback from multiple stakeholders, when necessary.
- Contribute to and review the quality and commissioning plans for the electrical discipline. Support electrically relevant Factory Acceptance Tests (FAT) and all off and on site commissioning.
Information collected and processed as part of your Google Careers profile, and any job applications you choose to submit is subject to Google's Applicant and Candidate Privacy Policy.
Google is proud to be an equal opportunity and affirmative action employer. We are committed to building a workforce that is representative of the users we serve, creating a culture of belonging, and providing an equal employment opportunity regardless of race, creed, color, religion, gender, sexual orientation, gender identity/expression, national origin, disability, age, genetic information, veteran status, marital status, pregnancy or related condition (including breastfeeding), expecting or parents-to-be, criminal histories consistent with legal requirements, or any other basis protected by law. See also Google's EEO Policy, Know your rights: workplace discrimination is illegal, Belonging at Google, and How we hire.
If you have a need that requires accommodation, please let us know by completing our Accommodations for Applicants form.
Google is a global company and, in order to facilitate efficient collaboration and communication globally, English proficiency is a requirement for all roles unless stated otherwise in the job posting.
To all recruitment agencies: Google does not accept agency resumes. Please do not forward resumes to our jobs alias, Google employees, or any other organization location. Google is not responsible for any fees related to unsolicited resumes.